Design, structure, installation and the subsidy file, by one team. The solar division sits in the same office as the testing lab, so a roof survey and a sample logbook share a project file.

Rows of solar panels on a mounting structure at dusk

What we install.

Rooftop systems across Delhi NCR, sized to the roof and the sanctioned load.

  • Home rooftop

    A grid-connected system on a house roof, with the net meter and the subsidy claim that goes with it.

  • Group housing and RWAs

    Common-area plants for lifts, pumps and lighting, where the ₹18,000 per kW support applies to the society's own connection.

  • Commercial and industrial roofs

    Larger arrays with a load study first, then structure, cabling and commissioning around your working hours.

  • Structure and fabrication

    Raised frames, walkways and cable trays fabricated for the roof, so panels sit clear of the waterproofing.

Assessment, design, build, activate.

Four stages. You approve the design and the price before the third one begins.

  1. Assessment

    We measure the roof, the shadow, the sanctioned load and your last year of bills.

  2. Design

    Panel layout, string sizing, structure drawings and the DISCOM application forms.

  3. Build

    Structure, wiring, modules and inverter installed, earthed and tested on site.

  4. Activate

    Commissioning, net metering and the subsidy claim uploaded with your documents.

What the government pays.

PM Surya Ghar Muft Bijli Yojana is a residential scheme. It pays a fixed amount per kW after commissioning.

Swipe the table sideways to see every column.

PM Surya Ghar central subsidy by system size
System size Central subsidy, general states Central subsidy, special-category states
1 kW ₹30,000 ₹33,000
2 kW ₹60,000 ₹66,000
3 kW and above ₹78,000 cap ₹85,800 cap

The third kilowatt earns ₹18,000, not ₹30,000, which is why the cap lands at ₹78,000. Special-category states are paid a higher rate per kW from the centre. Assam and Uttarakhand are in that list. A larger system does not raise the household cap.

Delhi adds a state top-up

The Delhi Solar Energy Policy pays a state capital subsidy of up to ₹26,000 per kW, capped at ₹78,000 for a household. It is linked to the project cost and the tender price, so it is not a flat payment on every roof.

Society common areas carry a proposed ₹11,000 per kWp, subject to the same cost test.

Group housing and RWAs

Common facilities get ₹18,000 per kW up to 500 kW, at up to 3 kW per house. The ceiling counts any rooftop plants the residents already installed.

Commercial and industrial premises get no household subsidy. Net metering and state policy apply instead.

State by state.

Most states publish no separate residential top-up. We check your state's current order before quoting.

Swipe the table sideways to see every column.

State support for residential rooftop solar, checked October 2026
State Extra state support Status
Delhi ₹26,000 per kW, capped at ₹78,000 In policy, tied to project cost
Uttar Pradesh ₹15,000 per kW, capped at ₹30,000 Published by UPNEDA, confirm availability
Haryana None published Central subsidy only
Rajasthan None published Central subsidy only
Gujarat None published Central subsidy only
Maharashtra None published for homes Central subsidy only
Madhya Pradesh None published Central subsidy only
Punjab None published Central subsidy only
Karnataka None published Central subsidy only
Tamil Nadu None published Central subsidy only
Kerala None published Central subsidy only
Telangana None published Central subsidy only
Andhra Pradesh None published Central subsidy only
West Bengal None published Central subsidy only
Bihar None published Central subsidy only
Uttarakhand Higher central rate, no state top-up Special-category state
Chhattisgarh None published Central subsidy only
Odisha None published Central subsidy only
Assam Higher central rate, no state top-up Special-category state

“None published” means we found no separate residential top-up in the state's current published material as of October 2026. It does not mean a scheme cannot exist, and several states revise these orders through the year. Ask us to check your state before you sign anything.

How the money reaches you.

Six steps on the national portal, and the subsidy arrives after the meter does.

  1. Register

    Your state, DISCOM and consumer number on the PM Surya Ghar portal.

  2. Feasibility

    The DISCOM approves the capacity your roof and connection can carry.

  3. Pick a vendor

    An empanelled installer, and equipment that meets the scheme rules.

  4. Install

    Structure, modules, inverter and the meter, installed to the approved design.

  5. Inspect

    DISCOM inspection, grid synchronisation and net-metering formalities.

  6. Claim

    Commissioning documents and bank details uploaded, then the subsidy is released.

What the subsidy is not.

Four things worth knowing before you count the money.

  • It is residential

    The household subsidy applies to a home connection. A shop, office or factory is not eligible for it.

  • It is capped at 3 kW

    A 5 kW roof still earns ₹78,000. The rest of the system is yours to fund.

  • It follows the meter

    No commissioning, no inspection, no payment. Panels on a roof are not a claim.

  • It is not free power

    “Free electricity” is a slogan. The subsidy offsets part of the cost, and your bill depends on what you use.

Figures checked October 2026 against the PM Surya Ghar national portal, the Delhi Solar Portal state-subsidy page and the MSEDCL I-SMART page. State schemes change; confirm with your DISCOM before signing.

Start with the roof survey.

Bring the last year of bills and the sanctioned load. The rest is measured on site.

Call
+91 92116 57613
Email
support@cervoltanalytics.com
Visit

Kaushik Enclave Block A, Burari, Delhi 110084

Talk to the lab

Call, or send a WhatsApp message.

Same number, same people. Choose whichever is easier.

Prefer email? support@cervoltanalytics.com